Electrical works and lighting roof factory

In addition to the five existing production halls, Linex Prefab Daksystemen built a new roof factory in Hulst (the Netherlands). The new site is one of the most modern semi-automated roofing factories in the Benelux.

This automation of the production process requires a considerable surface area. The new factory therefore has an area of more than 2400 square meters and a height of almost 9 meters. A large room without power supplies or lighting.

Electrical installation and lighting

GIEC Nederland was responsible for the complete electrical installation of the new warehouse: engineering, panel construction and all electrical installation work.

New high voltage cabin and transformer

With this capacity expansion, the existing electricity connection soon proved to be insufficient. Linex therefore also approached GIEC Nederland for a new high-voltage cabin with low-voltage distribution. The team took care of the entire engineering, coordination with the energy supplier and installation.